1·Its local sour at bridge pier is different from that of alluvial channels.
建桥后,桥墩局部冲刷与一般冲积河流不同。
2·A new method to check bridge pier damage by dynamic experiment is introduced.
介绍了一种利用动力实验检测桥梁破损的方法。
3·The paper introduces the cutting blasting demolition of a railway bridge pier.
介绍了某铁路桥桥墩台帽的切割爆破拆除。
4·Using energy method, the geometric non-linear of higher bridge pier is analyzed.
考虑地基弹性变形影响,用能量法对高桥墩进行几何非线性分析。
5·It is important to evaluate the security of bridge pier that was crashed by the truck.
如何评估汽车撞击对桥梁产生的安全影响是一个非常重要的问题。
6·By the use of video technology to achieve a collision avoidance warning to the bridge pier.
提出一种利用视频技术实现对桥墩防撞预警的方法。
7·The wedge-shaped end of a bridge pier, designed to divide the current and break up ice floes.
桥墩分水角桥墩的楔形边缘,用来分开水流并打碎浮冰块。
8·The bridge is composed of bridge stride, bridge pier, bridge platform and the cone of end of the bridge.
桥梁主要由桥跨、桥墩、桥台及桥头锥体等部分组成。
9·The gravity bridge pier built on weak ground base may be lifted off the base during strong earthquake event.
软弱地基上的重力式桥墩,在强烈地震作用下, 有可能会发生桥墩基础提离现象。
10·Research results: According to the measured data, the increased range of stiffness of bridge pier is less than 3%.
研究目的:通过研究在制动力作用下墩顶刚度的提高程度,验证现行设计规范的合理性。